.

Node Control Latency

The MPI calculates the SynqNet control latency for each node. This is the time from when the feedback input is sampled at the node to the time when the demand output available on the node. This duration of time includes internal node delays, packet scheduling, network delays, controller delays, and controller calculation time. It does not include delays for serial encoders, drive feedback delays, or drive demand delays.


 

See Also:

MPISqNodeConfigControlLatency

Cable Length | Confirming SynqNet Control Latency

 

       Legal Notice  |  Tech Email  |  Feedback
      
Copyright ©
2001-2021 Motion Engineering